Analisa Network Perbaikan Jalan Menggunakan Metode Algoritma Es Ef Dan Ls Lf Di Temuwuh Kidul Balecatur Gamping Sleman Yogyakarta
Minarwati 01 September 2017 Manajemen Informatika

Abstract / Intisari :
Abstract Network Analysis can describe a network that must be run in a certain order and limited by time, one of them to complete a project. Earlies Start Time (ES) Earlies Finish Time (LF) algorithm The Latest Finish Time (LF) is one of the methods in network analysis that can be used to solve problems in a job project. The roadwork project is one of the most suitable projects in the analysis using network analysis of ESF and LS LF algorithm methods. One of the road works projects is the repair of the village entrance and the Puri Balecatur Asri Housing of Temuwuh Kidul Balekatur Gamping Sleman Yogyakarta. Road along ± 1km condition is currently badly damaged, it had been repaired with asphalt using funds obtained from the dues of residents both housing and hamlet. Due to unstable soil conditions the roads are quickly damaged again, even worse than before. Under such conditions so residents plan to repair the road not by asphalting but by casting. So that the project can be done with the right time it is necessary to order the right work so that the funds issued not swell, considering the funds are obtained from the contribution of citizens, so as not to burden the citizens in paying the dues later. The above problems can be solved using network analysis method of EF and LS LF algorithmaES, with the method can know the exact job sequence so it is expected that the foundry repair project of hamlet entrance and residential Puri Balecatur Asri can be completed on time and using the fund that is not big. Keyword: Analyze Network, Project, Algorithm, method, ES, EF, LS, LF

File PDF :
   Minarwati-63-stmikelrahma.pdf

Tag Jurnal :
   0